Phased targeted building envelope repairs in a fully operational elementary school
Work consisted of the removal of the face sealed stucco and EIFS cladding at selected wall and soffit areas and the installation of new stucco cladding onto a drained and vented rain screen cavity, installation of insulation and a vapour barrier at interior walls, re-glazing with new sealed insulating glazing units on all windows, replacement of door weather stripping, replacement of skylights, installation of cement board to protect existing exposed foundation waterproofing